Construction of the 2nd main sewage pipeline of Thessaloniki from well 50N to the Thessaloniki sewage treatment facility

The existing main sewage pipeline (MSP), with total length of 15,812m, was constructed in the early 1980s;its starting point was at drainage well 98, at th junction of Solonow and Markou Botsari streets, with a gradually increasing cross-section of D2100,D2400,D2700. In the pipeline's final section, from drainage well 50N to the sewage treatment facility, with a lenght of 4,605 m, the original design provided for the construction of the two brances;of these, only the 1st branch was constructed, covering demand for the next 20 years.